Highways, elevated structures and airfields across five states.
Projects
COMPLETED
4-laning of Dhangaon–Boregaon section of NH-347BG & 753L (Indore to Boregaon, Pkg IV), 58 km, Madhya Pradesh. Hybrid Annuity Mode
₹831.00 CrNHAI · Bharatmala Pariyojana Phase-I
Elevated Corridor in Ranchi city, NH75 (km 0.00 to 3.570) with down ramp on NH23, Jharkhand. EPC mode
₹291.00 CrNHAI
Balance work of 4-laning of Rampur–Kathgodam section of NH-87 (Package-I), Uttar Pradesh. EPC mode
₹190.76 CrNHAI
Advance Landing Ground and allied services for basic infrastructure at Nyoma, Ladakh
₹218.00 CrBRO
ONGOING
Rewa Bypass as 4-lane with paved shoulder and service road on NH-30 (19.20 km), Madhya Pradesh. Hybrid Annuity Mode
₹300.00 CrMPRDC
Resurfacing of runway and allied airfield works including area drainage at AF Stn Tezpur
₹368.74 CrMES
Construction of tech infra and allied services at Bikaner and MFFR under GEP Bikaner Phase II. EPC mode
₹144.57 CrMES
Rehabilitation and upgradation of Sidhi–Singrauli Road (NH-39, 105.59 km) to four lane with paved shoulder, Madhya Pradesh. Item Rate Mode
₹343.20 CrMORTH
Airside development works at Lokpriya Gopinath Bordoloi International Airport, Guwahati
₹121.13 CrAdani
NEW / AWARDED
Expansion of Barapani (Shillong) Airport: runway extension, terminal building and apron, airside works (Phase-1 recall)
₹82.36 CrAAI
Extension of runway PTT and construction of apron, taxiways, RESA, GSE area, link road and associated works at Agra Airport (2nd recall)
₹79.31 CrAAI
Financials
ANNUAL TURNOVER (₹ CR)
NET WORTH (₹ CR)
Own Equipment Fleet
A large owned fleet keeps schedules and quality in our own hands.
Earthwork
Excavators 32 · Dumpers 146 · Dozers 8 · Graders 40 · Rollers 35
Bituminous works
HMP plants 4 · Pavers 4 · Tandem rollers 8
Concrete
Batching plants 8 · Concrete pumps 6 · Transit mixers 45 · Boom placers 4
Others
WMM plants 4 · Crusher plants 6 · Trailers 4 · DG sets 18 · Hydraulic cranes 8